“Perfection is attained not when there is nothing more to add, but when there is nothing more to remove.”
Antoine de Saint-Exupéry, aviator and writer, author of The Little Prince and a working pilot who spent years thinking about how machines are designed
Every few months a committee calls us with a number already attached to the project. They have been meeting for a year, they have a rough square footage in mind, and they have a figure somewhere around four or five million dollars. What they want from us is a design. What we ask for first is a normal weekday and whatever day represents their worst crunch, so we can walk the building while it is actually in use, count cars, watch where people stack up in a hallway, and see which rooms sit dark. More than once, that walk has ended with us telling a group of very committed people that the problem they described is not a building problem.
That is an awkward thing to say to a room that spent eighteen months getting to consensus, and it is also the most valuable thing an architect can say when it happens to be true. A building is an answer. Before anyone commits several million dollars and two years of organizational attention to an answer, somebody has to be willing to interrogate the question, and that interrogation costs a fraction of one percent of what the wrong building costs.
The question underneath the question
Almost every client arrives with a solution already selected. “We need more space” sounds like an observation, but it is a conclusion. The actual observation is usually narrower and more specific than that: the lobby becomes impassable in the fifteen minutes between services, or the youth group and the women’s Bible study both want the same room on Wednesday, or a franchise operator is turning away catering orders because there is no staging area near the back door. Each of those observations has more than one possible answer, and construction is only one of them.
Sometimes the constraint is time rather than area. A congregation that feels full at one service is often not full at two, and adding a service is a staffing conversation rather than a construction contract. Sometimes the constraint is circulation, and a sanctuary that seats six hundred can feel intolerable at four hundred if the only path from the parking lot runs through a twelve foot lobby. And sometimes it is parking, the quietest cap on attendance in the entire building industry and the one owners are least likely to name on their own. Square footage is the most expensive way to solve a scheduling problem.
Square footage is the most expensive way to solve a scheduling problem.
None of this means the building is unnecessary. Often it is exactly necessary, and the assessment confirms that in the first week. The point is that the assessment has to be capable of returning a different answer. An evaluation that can only conclude “yes, and here is how big” is not an evaluation. It is a sales process with a clipboard.
What an honest assessment actually looks at
The first thing we look at is utilization across a full week rather than at the peak hour. Most organizations describe their space problem using their busiest ninety minutes, which is understandable but misleading, because a building sized for the peak sits empty for the other hundred and sixty-six hours. If a room is used hard on Sunday morning and dark from Monday to Saturday, the question is whether the organization needs a second room or a more flexible first one. We have watched clients recover the equivalent of a small addition through operable partitions, better storage, and a scheduling policy nobody had written down.
The second thing we look at is where the real ceiling sits. Occupant load, restroom fixture counts, exit width, and required parking ratios can cap a building well below what the seat count suggests, and those caps do not care how much a group wants to grow. It is not unusual to find that a proposed addition would trigger a parking requirement the site cannot physically hold, or that the existing building is already at the fixture limit for the occupancy it claims. Finding that in month one changes the strategy. Finding it in month fourteen is an expensive correction.
The third thing is a straightforward comparison of options at the level of dollars per outcome. A three thousand square foot renovation that reworks circulation and converts underused area sometimes delivers eighty percent of what a twelve thousand square foot addition would, at a quarter of the cost and without a construction season that disrupts operations. That comparison only becomes possible once the organization’s needs have been translated into defined spaces, sizes, and adjacencies, which is the discipline of defining the building program before anything gets drawn. Skip it and there is nothing to compare the addition against.
Worth knowing
Most architectural fees are a percentage of construction cost, which means the person advising you on how much to build is generally paid more when you build more. That is not a scandal, it is how the industry prices work. But it is a fair question to ask any firm you interview, and the answer tells you a great deal about how they will behave in month three.
The math has gotten less forgiving
There has always been a case for building only what you need, and in 2026 that case is sharper than it was five years ago. Nonresidential construction spending fell seven percent in nominal dollars through the first five months of the year, and the AIA Consensus Construction Forecast Panel cut its 2026 projection from a one percent increase to a slight decline. Meanwhile tariffs on steel, aluminum, and imported lumber have pushed materials costs up roughly six percent, and Turner’s building cost index rose more than five percent in the second quarter alone. Fewer projects are moving forward, and the ones that do are paying more per square foot than their sponsors budgeted two years ago.
What concerns us more than the escalation itself is how owners typically respond to it. The cost pressure arrives at the end, when bids come back, and the reaction is compression under deadline.
From the research
“So, when projects exceeded their projected budgets, the response was reactive: scope reductions, schedule compressions and last-minute material swaps.”
Construction Dive — The tariff storm has a silver lining. And it belongs to preconstruction.
Scope reduction under bid pressure and scope definition at the outset produce very different buildings, even when they land on the same square footage. The first is subtraction performed in a hurry by people protecting a groundbreaking date, and it takes whatever is easiest to remove rather than whatever matters least. Acoustic treatment goes, then the second set of restrooms, then the covered entry, and the organization ends up with a building that is the right size and the wrong building. We would rather have that conversation in month one, when it is a conversation, than in month sixteen, when it is triage.
Recommending less, and what comes after
When the assessment points away from new construction, the recommendation is rarely just “don’t build.” Sometimes it is to renovate, because the constraint is arrangement rather than area. Sometimes it is to build half as much, reserving the site and sizing the utilities and structure so the rest can be added later without a demolition bill. That is the substance of planning growth in phases rather than in one commitment, and it is often the difference between a phase two that costs a modest premium and a phase two that requires undoing phase one. And sometimes it is to wait twelve months, pay down existing debt, and revisit the numbers with a stronger balance sheet.
Across more than a thousand church projects and twenty five years of commercial, hospitality, and nonprofit work, the pattern that shows up most consistently is this: the organizations happiest with their buildings are the ones that seriously considered not building. They arrive at construction having eliminated the alternatives on purpose rather than by default, and their committees can tell a skeptical donor exactly why the addition was necessary, because they looked hard at three cheaper options and can say what each one failed to solve. That clarity survives the difficult months of construction in a way that enthusiasm does not.
There is also a practical reason we are willing to talk a client out of work. A firm that will tell you not to build is a firm you can believe when it tells you to build, because the recommendation carries weight precisely by not being automatic. Everything that follows, the budget, the schedule, the value engineering conversations that inevitably arrive, gets easier when the owner already knows the architect will tell them things they did not want to hear.
Worth asking
What if we already raised money for a building we may not need?
Funds raised for a stated purpose usually carry restrictions, so this is a question for your attorney and accountant before it is a design question. In practice, donors respond well to being told that a cheaper solution was found and that their gift will be redirected to a specific, named alternative. What damages trust is discovering later that the money was quietly spent on something else.
How do we tell whether a firm is right-sizing us or just protecting its fee?
Ask them to show the work. A firm making a genuine recommendation can produce the utilization observations behind it, the options it considered and rejected, and a rough cost comparison across those options. A firm that cannot explain why the smaller option was ruled out has probably not evaluated it. This holds in both directions, since a recommendation to build less should be as well documented as one to build more.
Is there a real risk of building too small?
Yes, and it is not hypothetical. Under-building is the second most common regret we hear, behind overbuilding, and it usually surfaces four or five years in. The protection is not extra square footage but a master plan that reserves land for the addition, sizes mechanical and electrical service for the eventual load, and details the structure and roof so a future connection is straightforward. Built that way, growing later costs a manageable premium instead of a second project.
The way we work is built around getting the question right before anyone commits to the answer. That means walking your building while it is in use, testing the assumption that more area is the fix, and putting renovation, phasing, scheduling, and new construction side by side with real numbers attached to each. It is the same instinct we carry through every stage that follows, which is that no one should ever hear a problem from us without also hearing the options for solving it. Twenty five years and more than a thousand projects have left us with something more useful than drafting capability, which is a long memory of what has and has not worked for organizations in your position. If you are in that early stretch where the committee has a number but not yet a plan, we would be glad to walk the building with you and tell you honestly what we see. There is no obligation attached to that conversation, and occasionally it ends with us recommending you spend a great deal less than you expected.
Let’s Talk About Your Project
Every project starts with a conversation. If you have something in mind — or just a question — reach out and we will get back to you within one business day.